浙江合生吊装工程有限公司
Uzbekistan Bash Expansion 52MW Wind Power Project

This project is a 52MW wind power expansion undertaken by our company for ACWA Power. The plant is located in Jizzakh District, Republic of Uzbekistan, also known as the Bash Expansion Area. The area lies within the South Tianshan (STS) region, which is mountainous and generally stretches east to west. The Tianshan Mountains extend more than 2,800 kilometers along the east - west axis, from Xinjiang in northwest China across Kazakhstan, Tajikistan, and Kyrgyzstan, reaching the Aral Sea in Uzbekistan. The highest peak rises above 7,000 meters, while the lowest point lies in the eastern Tianshan at an elevation of 154 meters.

At present, the construction site of our project is located at an altitude of 260–275 meters, with generally flat terrain, which greatly enhances both safety and efficiency during construction. The first wind turbine installation is scheduled for November 14, 2024, and the project is expected to be completed within approximately three months.

返回列表
X二维码

截屏,微信识别二维码

微信号:

(点击微信号复制,添加好友)

  打开微信

微信号已复制,请打开微信添加咨询详情!